Latest Update: 06/10/2020


The below log shows all updates for this product since release:


v1.01

- Added missing Toton Free roam Scenario 

- Fixed Matlock to Nottingham Quick Drive - Previously routing trains to East Midlands Parkway instead of towards Attenborough

- Edited signal TC4577 at Toton so that the call on signal doesn't show when line isn't clear. 

- Fixed sizing of salt boxes - previously oversized 

- Removed [DNL] The Trent Tractor Track Bash Scenarios previously included by error.

- Removed [EVL] 1R58 07:46 Nottingham - Liverpool Lime Street scenario previously included by error. 

- Fixed floating Datum plates at Attenborough 

- Fixed double AWS ramp at Trent South Jn on the Down Nottingham

- Fixed texturing on bridge at Barrow-Upon-Soar

- Added sound domes around Nottingham

- Fixed [Default] [DNL] 6D31 Radlett-Toton North Yard scenario (AI off path error)

- Speed limits adjusted approaching Derby from the south


IMPORTANT: You need to ensure that you have downloaded and installed the latest version of Midland Main Line: Sheffield-Derby route before you install this updated version to ensure the correct operation of this route. 


The product download in your account is updated as and when updates are released, so if purchasing after any of the given dates your product will include all updates prior to that date.


To download updates you will need to re-download the product from the 'Your Orders' section of your account which you can log into by clicking here.

For guidance on downloading this update, please visit this FAQ.